Your partner for all your work-by-others needs during your elevator modernization.

Macro Ecto works in lockstep with the elevator company to manage all of the HVAC, electrical, and fire life-safety work that elevator modernization projects require — not limited to machine room ventilation, disconnects and sub-panels, smoke control, and any other code items that could hold up final inspection.

01 / SCOPE

Three trades, one modernization timeline.

HVAC

Machine room & hoistway ventilation

Modern controllers and drives change heat loading and are required to be kept in controlled environments.

  • Machine room temperature & ventilation compliance
  • Hoistway pressurization coordination
ELECTRICAL

Power, disconnects & controls

New controllers and drives almost always trigger electrical code items that the elevator contractor won't scope.

  • Main line disconnect & shunt trip updates
  • Machine room power distribution
  • Lighting in elevator pits and hoistways
FIRE / LIFE SAFETY

Smoke control & fire service

Smoke detection requirements are frequently out of date on older installations.

  • Hoistway & machine room smoke detection
  • Fire-rated door & separation coordination
02 / PROCESS

How a project moves through Macro Ecto.

Scope review

We walk the equipment against current code before modernization drawings are finalized.

Gap report

A written list of HVAC, electrical, and fire items that need to change, tied to the applicable code sections.

Coordinated work

We schedule around the elevator contractor's timeline so nothing sits waiting on the other trade.

Inspection-ready

Documentation handed off in the form your AHJ expects, so final inspection isn't a surprise.

03 / CREDENTIALS

Who's doing the work.

CERTIFICATION QEI Certified
LICENSE Licensed Elevator Mechanic — Washington State
BACKGROUND Project Management
BUSINESS Licensed, bonded & insured in Washington